Installed 2 heavy bronze 8' portholes
they fit nicely in the old window openings inside the cabin
Having to replace the bulkhead separating the aft cabin and the engine room.
One side done!
Taking out all the old rusty iron that was used for internal ballast, this will be replaced with lead
I'm estimating about 2000 lbs worth of what looks like old grader blade material
No comments:
Post a Comment
Everyone can now comment on my blog