Pages

Monday, December 30, 2013

Megan D Day 34 and 35

 Installed 2 heavy bronze 8' portholes
 they fit nicely in the old window openings inside the cabin
 Having to replace the bulkhead separating the aft cabin and the engine room.
 One side done!
 Taking out all the old rusty iron that was used for internal ballast, this will be replaced with lead
I'm estimating about 2000 lbs worth of what looks like old grader blade material

No comments:

Post a Comment

Everyone can now comment on my blog